FBA1237B22W5-51

FBA1237B22W5-51

Part Number: FBA1237B22W5-51
Product Classification: AC Fans
Description: AC Blower 121x121x37mm 230VAC
Packaging: Bulk
ROHS Status: Yes
Currency: USD
PDF: Documents
  • Part Status Active
  • Features -
  • Ingress Protection -
  • Weight 1.4 lbs (635 g)
  • Bearing Type Ball
  • Fan Type Tubeaxial
  • Termination 2 Wire Leads
  • Noise 54.0dB(A)
  • Approval Agency CE, cUL, UL
  • Current Rating (Amps) 0.140A
  • Air Flow 23.0 CFM (0.644m³/min)
  • Voltage - Rated 230VAC
  • Material - Blade Polybutylene Terephthalate (PBT)
  • RPM 2700 RPM
  • Static Pressure 0.620 in H2O (154.4 Pa)
  • Material - Frame Polybutylene Terephthalate (PBT), Fiberglass Reinforced
  • Operating Temperature -4 ~ 158°F (-20 ~ 70°C)
  • Lifetime @ Temp. 80000 Hrs @ 40°C
  • Size / Dimension Square - 121mm L x 121mm H
  • Width 37.00mm
  • Power (Watts) 21.00W
  • Voltage Range 220 ~ 240VAC

Purchase

You can place an order on the website. We strongly recommend logging in before making a purchase, as you can track your order in real-time.

Payment Methods

For your convenience, we accept various payment methods, including PayPal, credit cards, and wire transfers.

RFQ (Request for Quotation)

It is advisable to request a quotation to obtain the latest price and stock information for the part. Our sales team will respond to your request via email within 24 hours.

Important Notice

You will receive order information emails in your inbox. (If you do not receive our response, remember to check your spam folder). Due to possible fluctuations in stock and prices, the sales manager will reconfirm the order and inform you of any updates.

Delivering Time

Shenzhen Cluster Technology Co. ships orders once a day at about 5 pm, except Sunday. Regarding in-stock parts, orders can generally be ready to ship within 4 hours. Shenzhen Cluster Technology Co. customers can select from a range of delivery options. Estimated delivery time and cost are based on the method you choose: DHL Express, 5-7 business days. DHL eCommerce, 5-7 business days. FedEx International, 5-7 business days.

Which parts are supplied in stock?

Shenzhen Cluster Technology Co. supplies integrated circuits (ICs), resistors, capacitors, inductors and diodes from stock. Open a part number to see the brand and specifications, then request a quote for quantity and lead time. Genuine stock is confirmed when you inquire.

How do I request a quote by part number?

Open the part page and check the brand, package and electrical specifications against your requirement, then send an inquiry with the part number, quantity and target lead time. For several lines, use BOM matching and list every part once.

Do you support BOM matching?

Yes. Send the part numbers, quantities and brands. We check integrated circuits, resistors, capacitors and inductors against current stock, then reply with the quantity that can be delivered and the lines that need to be ordered.

Related Products

Manufacturer